These are the real files from the back end of the system, same document control tables, risk scoring, checklists and sign off sheets, plus the front cover of the company capability deck. Type your company name in, drop your logo on and switch between the docs. Nothing is uploaded, it all runs in your browser.

[ Insert your company logo ]
[ Your company name ]
[ Your trades / divisions ]

Risk Assessment & Method Statement

PREFIX-RAMS-05

Revision 1.0

Uncontrolled when printed

Drainage, Gully & Chamber Works

Installing and maintaining drainage runs, gullies, chambers and connections

Make this document yours

Every highlighted field is a placeholder. Replace the logo, company name, trades strapline, document reference prefix and the footer with your own details, then remove the shading. The method statement, risk assessments and controls are ready to use, review and adapt them to your actual job and site.

Document control

Document referencePREFIX-RAMS-05Revision1.0
Document typeGeneric RAMS (site specific detail per job)StatusMaster template
Prepared by Date issued 
Reviewed / approved by Next review date 

1. Job & site details (complete per job)

Project / job no. Client / Principal Contractor 
Site address Date of works 
Site contact No. of operatives 
Site supervisor Anticipated duration 
what3words (work area) what3words (access / meet) 

2. Scope of works

Operatives excavate for, install, connect and maintain drainage, pipe runs, gullies, catchpits and chambers, including breaking out, laying, jointing and reinstating.

Deep or enclosed chambers may be confined spaces; where so, the Confined Space Entry RAMS applies.

3. Sequence of work (method statement)

3.1 Arrival & set up

  • Sign in as required and attend the site induction. Confirm access, welfare, parking and any client or principal contractor rules.
  • Brief this RAMS to all operatives. Everyone signs the register. Confirm competence, tickets and cards required for the task.
  • Walk the work area and carry out a dynamic risk assessment. Record any site specific hazards in section 8 and agree controls before starting.
  • Confirm mobile signal, first aid provision, nearest A&E and emergency arrangements. Set out exclusion zones, barriers and signage.

3.2 Excavation

  • Confirm buried services (drawings plus CAT & Genny); hand dig near known services. Support, batter or step excavation sides for depth and ground.
  • Keep spoil and plant back from the edge; provide safe access, edge protection and lighting; inspect daily.

3.3 Installation & connection

  • Lay and joint pipes and set chambers to line and level. Use mechanical aids for heavy units and covers.
  • Do not enter a chamber classed as a confined space without atmosphere testing, a permit and a rescue plan.
  • Manage water, pump or divert as needed; beware contaminated water and foul drainage; wash hands before eating.

4. Risk assessment

Risk = Likelihood x Severity. Left rating is before controls, right rating is the residual rating with controls in place. Low 1-6, Medium 8-12, High 15-25.

HazardWho is at riskLSRControl measuresLSR
Contact with buried servicesOperatives4520Service drawings, CAT & Genny sweep, permit to dig, hand dig within 500mm, services marked up248
Collapse of excavationOperatives4520Batter, step or trench box, daily inspection, spoil and plant kept back from edge, no lone entry248
Plant / pedestrian interfaceAll on site4416Segregated zones, banksman on all moves, 360 visibility aids, hi vis, reversing alarms236
Foul water / biological hazardOperatives339Gloves and waterproofs, no eating or smoking in the work area, welfare and hand wash before breaks133

5. Site specific hazards (complete on site)

Site specific hazard identifiedControl measureActioned by

6. Emergency arrangements (complete per site)

In an emergencyCall 999. Give the what3words location for the casualty. Send someone to the access point to direct the ambulance.
Site what3words / address 
Nearest A&E hospital 
Nominated first aider 
Assembly / muster point 

7. Briefing register

Name (print)CompanySignatureDate
[ Your company name ] | [ Reg no. ] | [ Address ]PREFIX-RAMS-05 | Page 1 of 1